B
- Bridge loan
- Short-term debt that carries a project until long-term financing is in place.
- Buildability
- How easily and economically a design can be built.
C
- Cap rate
- Net operating income divided by value or sale price; a higher rate means a lower value.
- Capital plan
- The plan for how a project will be paid for: which money comes from where, how much and when.
- Capital stack
- The layers of money that fund a project, in the order they are repaid, from senior debt at the bottom to common equity at the top.
- Chapter 312 abatement
- An agreement under Chapter 312 of the Texas Tax Code in which a city, county or other eligible taxing unit exempts all or part of the increase in a property's value from its taxes for up to 10 years, in exchange for commitments from the property owner.
- Chapter 380 and 381 agreement
- An economic development agreement under Chapter 380 (cities) or Chapter 381 (counties) of the Texas Local Government Code, providing loans or grants of public money, usually tied to performance such as investment or jobs.
- Construction monitor
- An independent inspector hired by the lender who confirms work is in place before the lender releases each payment. The monitor reports to the lender.
D
- Debt fund
- A private fund that makes loans, often faster or on more flexible terms than a bank.
- Debt service coverage
- A property's net operating income divided by its annual loan payments. The loan terms set the minimum ratio.
- Debt yield
- A property's net operating income divided by the loan amount, shown as a percentage.
- Draw
- A payment from a construction loan, released in installments as work is completed and verified.
I
- Intercreditor agreement
- An agreement between the senior lender and a subordinate lender that sets out each one's rights, including what the subordinate lender may do if the borrower defaults. Preferred equity uses a similar recognition agreement.
- Interest reserve
- Money set aside in the construction budget to pay loan interest until the project produces income.
L
- Lease-up
- The period of signing first tenants.
- Lien waiver
- A document in which a contractor, subcontractor or supplier gives up its right to claim a lien for work it has been paid for. In Texas, a waiver is enforceable only if it substantially follows the forms in Chapter 53 of the Property Code.
- Loan-to-cost
- The loan amount divided by the total project cost.
- Loan-to-value
- The loan amount divided by the property's appraised value, often its value on completion or at stabilization.
M
- Maximum-price contract
- A construction contract under which the contractor is paid its costs and a fee up to a ceiling stated in the contract. Costs above the ceiling fall on the contractor, subject to the contract's terms.
- Mezzanine debt
- A loan that sits behind the senior loan, usually secured by the ownership interests in the borrower rather than the property. It costs more because it is repaid after the senior loan.
- MUD (municipal utility district)
- A political subdivision created under the Texas Water Code to provide water, wastewater and drainage, and in some cases roads and parks. A MUD issues bonds repaid from property taxes in the district and often uses them to reimburse the developer who built the facilities.
N
- Net operating income
- A property's income after operating costs, before loan payments and income taxes.
O
- Owner's representative
- A manager who acts for the sponsor with the contractor and lender.
P
- PID (public improvement district)
- A district created by a city or county under Chapter 372 of the Texas Local Government Code. Assessments on benefited property pay for public improvements, through PID bonds or by reimbursing the developer.
- Preferred equity
- An ownership investment that receives its return before common equity and after the project's debt.
- Pro forma
- A projection of a property's income, costs and returns.
R
- Retainage
- A share of each payment held back until the work is complete. On private projects in Texas, the owner must also reserve 10 percent of the contract price until 30 days after the work is completed (Property Code Sec. 53.101).
S
- Schedule of values
- The contract price broken into line items, used to measure progress and approve each payment.
- Senior debt
- The first-priority loan, secured by the property and repaid first.
- Sources and uses
- A table of every dollar the project needs (uses) and where each dollar comes from (sources). The two totals match.
- Sponsor
- The developer or company that controls a project, puts in its equity and makes its decisions.
- Stabilization
- The point where a property's occupancy and income reach their planned level.
T
- Term sheet
- A lender's non-binding summary of proposed loan terms.
- TIRZ (tax increment reinvestment zone)
- A zone designated by a city or county under Chapter 311 of the Texas Tax Code. Part of the future growth in property tax revenue in the zone pays for public improvements there.
V
- Value-add
- Buying an existing property to renovate and re-lease.
W
- Will-serve letter
- A provider's written commitment to serve a project. It is often conditioned on capacity, agreements or payment, so lenders read the conditions.
General information only. Not legal, tax, accounting, investment or engineering advice.
Headquarters
Based in Dallas-Fort Worth
Our office is in Arlington, Texas. We work in Texas and across the United States, and take on international projects case by case.
Tell us about your project
Send the asset type, location, size, stage and timing. We will reply to set up a first call.
Institutional lenders: see how we work with you.