
Capabilities
Global sourcing
We source materials globally and domestically to fit each project's specification, schedule and funding requirements. Domestic content rules apply where a program requires them.
Stages of the project lifecycle this service covers. See the lifecycle
- 1 Feasibility, not covered
- 2 Capital, not covered
- 3 Design and permits, covered
- 4 Construction, covered
- 5 Handover, not covered
Services
What we do
- Supplier vetting
- Third-party inspection against the design team's specifications
- Shipping, customs and warehousing coordination, with licensed customs filers and freight intermediaries
- Currency exposure and supply chain planning, coordinated with the sponsor's bank
When to call
When sponsors call us
- 01
Equipment with long manufacturing times, such as transformers and switchgear, could hold up construction.
- 02
The sponsor wants to compare domestic and international suppliers on cost, lead time and risk.
- 03
Federal funding or tax credits carry domestic content rules, such as Build America, Buy America requirements or the domestic content bonus for clean energy credits.
Process
How an engagement runs
- 1
Requirements
Specifications from the design team and the lender's conditions.
- 2
Supplier vetting
Shortlist, references, capacity and quality systems.
- 3
Inspection
Third-party inspection against specifications before shipment.
- 4
Logistics
Shipping, customs and warehousing planned against the construction schedule, with customs entries filed by filers licensed by U.S. Customs and Border Protection and ocean freight handled by intermediaries licensed by the Federal Maritime Commission where required.
- 5
Tracking
Lead times and risks reported with the construction program.
Outputs
Lead-time and risk register
Each row records: item; specification; supplier shortlist; stated lead time; inspection point; domestic content status; tariff exposure.
What we need
What we need from you
- Specifications or equipment schedules
- Required delivery dates
- Any program rules on domestic content
Questions
Questions
The sponsor, with its counsel, makes that determination from the manufacturers' documentation. We assemble the documentation. We do not make the determination.
We plan currency exposure with the sponsor's bank. We do not trade currency for sponsors.
For lenders
For lenders
Capabilities
Other capabilities
Project finance
Senior and mezzanine debt, preferred equity structuring and public incentives, with TJDM capital in select projects.
ExploreInfrastructure
Water and wastewater, data centers and digital infrastructure, and energy generation and storage.
ExploreReal estate
Mixed-use, Class A multifamily, industrial and logistics, and hospitality.
ExploreDesign and permitting management
Selection and coordination of independently licensed architects, engineers and surveyors, from concept through permits.
ExploreConstruction delivery
Program management from planning to handover, coordinating contractors on scope, schedule and budget.
Explore
Headquarters
Based in Dallas-Fort Worth
Our office is in Arlington, Texas. We work in Texas and across the United States, and take on international projects case by case.
Tell us about your project
Send the asset type, location, size, stage and timing. We will reply to set up a first call.
Institutional lenders: see how we work with you.