Data centers and digital infrastructure

A data center opens when the power arrives. Since Senate Bill 6, Texas asks large loads in the ERCOT region for site control, study fees and financial commitments before most projects have a tenant.

Market

What is driving projects

Figures as of November 2026.

  • ERCOT, which runs most of the Texas power grid, reported in July 2026 that it was tracking about 474 gigawatts of large loads seeking interconnection, about 90 percent of them data centers.

    (Source: ERCOT, presentation to the Senate Committee on Business and Commerce, July 29, 2026.)

  • Senate Bill 6 (2025) directs the Public Utility Commission to set interconnection standards for large loads in the ERCOT region, at a 75-megawatt threshold unless the Commission sets a lower one, including a study fee of at least $100,000, proof of site control and financial commitments for transmission.

    (Source: Tex. Util. Code Sec. 37.0561, added by SB 6, 89th Legislature.)

  • The Public Utility Commission adopted rules implementing those standards in September 2026 (16 TAC Sec. 25.194).

    (Source: PUCT Project No. 58481.)

  • On September 21, 2026, the Governor asked TCEQ to suspend permits sought by data centers pending power grid and water audits by ERCOT and the Texas Water Development Board.

    (Source: Office of the Governor, letter to TCEQ, September 21, 2026.)

Capital

Typical capital sources

  • Sponsor equity and joint venture partners
  • Development equity for land and power work, which now comes earlier under SB 6
  • Construction debt sized to a creditworthy tenant lease, refinanced with term loans or bonds backed by the lease
  • Infrastructure funds that finance sites with power secured and the building shell, before the tenant fits out the interior
  • Where a project raises outside equity, the sponsor's securities counsel and, where required, a registered broker-dealer handle it.

Capital

Capital by phase

Illustrative. Not a TJDM transaction.

  1. 1

    Land and power: sponsor and development equity

  2. 2

    Shell and core: construction debt against a signed lease

  3. 3

    Tenant fit-out: tenant capital or equipment financing

  4. 4

    Stabilized: term loan or securitized debt

Underwriting

What lenders underwrite

  • The tenant's credit and the lease term against the loan term
  • Whether the power path, including curtailment terms (when the utility or ERCOT can cut the site's power), supports the lease
  • Permits, including any state permit holds that apply to data centers

Underwriting

What we plan for

  • Utility and ERCOT study timelines and their costs
  • Water for cooling, and its permitting
  • Backup generation permitting
  • Lead times for transformers and switchgear

How TJDM helps

How TJDM helps

Headquarters

Based in Dallas-Fort Worth

Our office is in Arlington, Texas. We work in Texas and across the United States, and take on international projects case by case.

About the firm


Tell us about your project

Send the asset type, location, size, stage and timing. We will reply to set up a first call.

Institutional lenders: see how we work with you.