Glass and steel curtain wall at dusk

Insights

How a project capital stack fits together

Senior debt, mezzanine, preferred equity, common equity and incentives get paid in a set order. That order decides what each costs.

Most development projects are funded by several kinds of capital at once. Each sits at a different level of risk and expects to be paid for it. The order of repayment is called the capital stack.

Senior debt sits at the bottom. It is secured by the property and repaid first, so it is the cheapest money in the stack. On a construction loan, the lender funds in draws as work is completed and verified.

Subordinate capital sits above it. Mezzanine debt is usually secured by the ownership interests in the borrower, not the property. Preferred equity takes an ownership position with a priority return. Both cost more than senior debt because they are repaid later and lose more if the project struggles.

Common equity sits at the top. It is the sponsor's money and its partners', and it takes the first loss and the last return.

What lenders test

Senior construction lenders size the loan against loan-to-cost (the loan as a share of total cost) and loan-to-value (the loan as a share of appraised value), then check debt service coverage (income divided by loan payments) and debt yield (income divided by the loan amount) at stabilization.

They usually require the sponsor's equity to go in first, before the first loan draw, and ask for completion and carry guarantees (promises to finish the project and to pay interest and operating costs until it supports itself) from creditworthy guarantors.

Where mezzanine or preferred equity sits behind the loan, an intercreditor or recognition agreement sets out cure rights (the subordinate party's right to fix a borrower default before the senior lender acts), what the subordinate party may do if the borrower defaults, and when the senior lender must consent. If the borrower defaults, a mezzanine lender can usually foreclose on the pledged ownership interests and take control of the borrower, subject to the intercreditor agreement. Those documents can take longer to negotiate than the loan itself.

Public incentives

Abatements, grants and reimbursement agreements can lower cost or pay for public improvements, but they usually arrive on the city's or county's timetable, often long after the lender has funded. The capital plan has to show how the project carries those costs until the incentive is received.

Three questions decide whether a stack works

Does every layer agree on who controls decisions if something goes wrong? Do the funding dates line up with the construction schedule? Can the project carry the combined cost of capital at realistic rents and prices?

Run the downside first: costs up, lease-up late, rates higher. Then check which layer runs out of money first, and whether the documents say what happens when it does.

Common equityRepaid last
Preferred equity
Mezzanine debt
Senior debtRepaid first
Public incentives
Illustrative. Actual terms depend on the project, sponsor and market.

General information only. Not legal, tax, accounting, investment or engineering advice.

Headquarters

Based in Dallas-Fort Worth

Our office is in Arlington, Texas. We work in Texas and across the United States, and take on international projects case by case.

About the firm


Tell us about your project

Send the asset type, location, size, stage and timing. We will reply to set up a first call.

Institutional lenders: see how we work with you.